Project Info

Southern California Edison (SCE)
Aliso Canyon Energy Storage Project (ACES)
Engineering Advisory Services
Various Locations, California

The Challenges

Anser staff provided technical leadership and project coordination for the Distribution Field Engineering and Interconnection teams as part of the Aliso Canyon Energy Storage projects. The Aliso Canyon Energy Storage project was a result of a CPUC decision to fast track approximately 100MW of energy storage in the SCE and SDG&E territory. This was in response to the crisis of a natural gas leak at the Aliso Canyon natural gas facility, threatening the availability of necessary generation to keep the lights on in Southern California. To meet the necessary grid demands, the fast track projects were to interconnect these energy storage units within four months (a process that can take up to two years). This included the interconnection and commissioning of the 20 MW SCE energy storage units on the SCE system at the Mira Loma Substation. Anser staff was responsible for leading the Distribution Field Engineering teams through the technical interconnection process to ensure consistency.

Aliso Canyon Battery Storage